Product and Technology PR Seminar by Exhibitors
by exhibitor
Product/Technology PR Seminar
Product and Technology PR seminar by exhibitors
Reception on the day
free to attend
A total of 33 lectures will be held at three venues: Venue I, Venue II, and Venue III.
※Titles omitted
Session recording, photography and video recording
Anything is prohibited.
Due to circumstances, there may be some changes in the lecturer and the contents of the program.
DAY 1
5 / 25
Wed
10:30
|
11:30
5/25 (Wed) 10:30-11:30 I Venue
CSPI-D401
YAMAMOTO Foundation Works
"Ultra-low airhead slide construction method that the times demand"
~ "Further utilization for seismic reinforcement work for bridges, etc.!"~

YAMAMOTO Foundation Works
Engineering Department
Manager
Kazuhiro Yamazaki
Public works projects, which are concerned about financial shortages due to the declining birthrate, are trying to extend the life of bridges and standardize the budget through maintenance plans such as seismic reinforcement of existing infrastructure, as seen in the repair plan for extending the life of bridges. I'm here. At our company, we have focused on the future potential of the seismic reinforcement of existing infrastructure in particular, and have developed heavy machinery for piling work with an altitude limit of 4.5m to 3.1m, which is specialized for piling work under low altitude. Adopted for seismic reinforcement work by municipalities and NEXCO, etc., we are responding to nationwide demand.
DAY 1
5 / 25
Wed
13:00
|
14:00
5/25 (Wed) 13:00-14:00 I Venue
CSPI-D402
Kensetsu System
DX of construction management to survive the platform era
~ Hard work is over. Innovation in on-site management! ~

Kensetsu System
Major construction solution division
Manager
Kazuhiko Okuda
The use of digital platforms is becoming mainstream in the construction industry as well. Real-time browsing of on-site measurement values in addition to videos provides a sense of realism as if you were actually there. Further effects can be expected even in a remote presence with a sense of establishment. Also, shortening overtime hours, which has been an issue for many years, can be a solution if you use apps and cloud on your side. We will introduce cloud solutions such as "Daikata Cloud" developed from the perspective of the field.
DAY 1
5 / 25
Wed
14:30
|
15:30
5/25 (Wed) 14:30-15:30 I Venue
CSPI-D403
SITECH
Trimble Roadworks paving system
〜Introduction of the latest paving solution〜

SITECH
Market development group
1st class civil engineering construction management engineer
Harumi Masunaga
Trimble Roadworks is a new machine control MC system for asphalt finishers that receives precise position information from the TS that automatically tracks heavy machinery, calculates the screed height, and controls the screed height from the difference with the design data. In this seminar, we will introduce the functions of Trimble Roadworks, the effectiveness of introducing a 3D machine control system in pavement work, and the new functions expected in the future.
DAY 1
5 / 25
Wed
15:50
|
16:50
5/25 (Wed) 15:50-16:50 I Venue
CSPI-D404
ARAV Inc.
Remote control of 1,000 on-site heavy machinery by 2025
~ The future of DX conversion that ARAV thinks ~

ARAV Inc.
Marketing/DX Strategy Manager
Takenori Nakamoto
DAY 2
5 / 26
Thu
10:30
|
11:30
5/26 (Thu) 10:30-11:30 I Venue
CSPI-D405
Leica Geosystems
ICT Earthworks - Corresponding to workmanship management guidelines!
~ Efforts for new ICT utilization construction by Leica Geosystems ~

Leica Geosystems
GMAT Division
Chief
Kazuma Nishikawa
``Finished form management using ground photogrammetry'' was newly added in the 2010 revision of the ``ICT Earthworks - Finished form management guidelines'' announced by the Ministry of Land, Infrastructure, Transport and Tourism. In this seminar, we will introduce how to deal with new workmanship control methods by using explanations of these new guidelines and new technologies. In addition, we will also introduce examples of utilization using the GNSS receiving antenna "Leica GS18 I", which is equipped with a visual positioning function that complies with the new guidelines and enables highly versatile surveying.
DAY 2
5 / 26
Thu
13:00
|
14:00
5/26 (Thu) 13:00-14:00 I Venue
CSPI-D406
Kensetsu System
Necessities for ICT construction! The latest information on how to use Kaisoku Navi
~ GNSS + TS for everyday use and small-scale earthwork ~

Kensetsu System
Construction ICT Division
Manager
Katsuhiko Tanaka
We will show you the latest information on how to use Kaisoku Navi, which is used regularly at sites all over the country.
In addition to the total station, Kaisoku Navi has expanded the range of uses for everyday use with GNSS. We will introduce it with examples of its use in the field.
In addition, new standards for ICT utilization construction were announced this year as well. Attention should be paid to the fact that small-scale earthwork is a target of ICT utilization.
We will also deliver information on the latest standards, including the small-scale support function of Kaisoku Navi.
DAY 2
5 / 26
Thu
14:30
|
15:30
5/26 (Thu) 14:30-15:30 I Venue
CSPI-D407
NIKON-TRIMBLE CO.,LTD
Introduction of dynamic displacement observation system T4D
〜World example of dynamic displacement monitoring connected by cloud〜

NIKON-TRIMBLE CO.,LTD
Geospatial Division Marketing Department
Technical Marketing Section Manager
Masayuki Kanzaki
Trimble 4D Control (T4D) collects data by connecting various monitoring sensors such as GNSS receivers, total stations, meteorological equipment, and inclinometers in the cloud, and collects data from man-made structures such as bridges, dams, and tunnels, as well as the displacement and movement of nature. A monitoring system installed to detect In this seminar, we will introduce examples of dynamic displacement monitoring using Trimble 4D Control (T4D) around the world.
DAY 2
5 / 26
Thu
15:50
|
16:50
5/26 (Thu) 15:50-16:50 I Venue
CSPI-D408
GCERTI-JAPAN Co., Ltd.
It is possible to increase the order rate with only 300,000!
~ISO9001, ISO14001, ISO45001~

GCERTI-JAPAN Co., Ltd.
Management Department
General Manager
Ikuya Nakamoto
It is possible to increase the order rate with only 300,000! Over 2,000 companies have been audited by ISO!
Have you ever experienced any of the following problems?
1. The cost of auditing before receiving ISO certification is high
2. The burden of time and advance preparation for the examination is large
3.High pressure judging that uses technical terms and pokes around the corners
We are an auditing company that offers our customers ISO certification at no cost.
DAY 3
5 / 27
Friday
10:30
|
11:30
5/27 (Fri) 10:30-11:30 I Venue
CSPI-D409
Leica Geosystems
Introducing a 3D laser scanner that can easily acquire point clouds
~ How to use the new product “Leica BLK2GO” ~

Leica Geosystems
Reality Capture Division
Division Manager
Keisuke Nagatsuka
Introducing the new portable handheld laser scanner "BLK2GO", which has been recommended by many people since its release in February this year. The mobile laser scanner measures 10 times faster than terrestrial ones, and creates colored point clouds and panoramic images simply by holding it in your hand and walking around without the need for troublesome tripod installation. It improves work efficiency and enables speedy measurement without human intervention. In addition, examples of utilization (plotting, modeling, sharing) using these measurement data are also introduced.
DAY 3
5 / 27
Friday
13:00
|
14:00
5/27 (Fri) 13:00-14:00 I Venue
CSPI-D410
Kensetsu System
BIM/CIM Issues That Should Be Addressed Now
~ 1 year left until BIM/CIM principle application ~

Kensetsu System
Sales Planning Department Site Support Section
Manager
Kei Takagi
The Ministry of Land, Infrastructure, Transport and Tourism has announced that the BIM/CIM principle will be applied from 2023, but there are still many problems to be solved before the principle is applied. Among them, the development of human resources who can handle BIM / CIM is an urgent task for both ordering and ordering parties.
In this seminar, we will explain the issues of BIM/CIM and explain how to use BIM/CIM solutions from the perspective of human resource development using specific examples.
DAY 3
5 / 27
Friday
14:30
|
15:30
5/27 (Fri) 14:30-15:30 I Venue
CSPI-D411
SITECH
Construction DX of ICT-utilizing construction that connects site data with the cloud
〜Work history driven by WorksOS/Manager〜

SITECH
Product Marketing Group
staff engineer
Nao Nakamura
We will introduce Trimble's new construction cloud management system "WorksManager / WorksOS" that connects and cooperates with "3D CAD software", "MC/MG" and "surveying equipment" in ICT-based construction. Driven (data-based construction decision-making) based on data such as surveying, design, and MC/MG construction history using various heavy machinery regardless of location, such as offices, sites, and destinations, improves overall construction and operating efficiency. We will maximize and support construction DX.